A commercial solar project is judged on what it still produces in year ten, not on what it costs in month one. That depends on decisions made early: how the load is measured, how the system is sized against it, and who carries responsibility when performance drifts.
Timelines are driven mainly by approvals and grid connection rather than by construction. Design and procurement run in parallel with the approval process, and the connection date usually sets the critical path.
Where roof area cannot cover consumption, the balance can be met through open access supply or a power purchase agreement, either alongside on-site generation or instead of it.
Generation is only worth what it sustains. Operations and maintenance covers monitoring, preventive maintenance and performance-ratio tracking against the original design case.
Tell us the site, the load and the constraint you are working against, and we will tell you what is realistic.