A renewable transition that interrupts production has failed regardless of how much carbon it saves. Sequencing matters as much as technology: measure the load first, move it in stages, and keep a route back at every step.
With measurement. Understanding when and how the site consumes power determines which options are viable, before any equipment is selected.
Not necessarily. A power purchase agreement moves load onto renewable supply without the site funding the asset itself.
Yes, provided the work is staged. Phased delivery avoids making production dependent on a single cutover.
Tell us the site, the load and the constraint you are working against, and we will tell you what is realistic.